- Rojgaar Mela
- Closed
Site Fitter
KALCO ALU-SYSTEMS PVT. LTD. ITI / Apprentiship / Diploma Posted 25 Jun 2026
- Salary
- ₹14,000 /month
- Job location
- Gurugram (Uttar Pradesh)
- Experience
- Up to 3 years
- Openings
- 25
About the role
1) Shift Punctuality: Arrive at the designated construction or installation site precisely at the scheduled shift start time as directed by management or the Site In-Charge.
2) Adherence to Command Chains: Strictly follow and execute all technical, operational, and administrative instructions provided by the respective Site In-Charge, Project Manager, or PMO.
3) Prior Intimation of Leaves: Adhere to standard company leave guidelines; casual, unexcused, or unnotified absenteeism is strictly forbidden and constitutes a material breach of work discipline.
4) Leave Application Notice Period: Submit formal leave applications directly to the Site In-Charge and the HR department at least 48 hours in advance, except in cases of verified medical emergencies.
5) Zero Unauthorized Absence Rule: Any unexcused or undocumented absence exceeding 3 consecutive working days will automatically trigger immediate disciplinary proceedings or result in service discontinuation.
6) Digital Attendance Compliance: Utilize the Mr. KIT Mobile Application daily to mark geo-verified attendance check-ins and check-outs; manual, verbal, or late attendance claims will not be recognized or processed.
7) Real-Time Project Logging: Use the Mr. KIT Mobile Application to log real-time project milestones, task updates, and site completion metrics as required by the management.
8) Milestone Execution & Target Delivery: Work systematically to deliver daily, weekly, and monthly installation outputs exactly according to the technical layout plans, blueprints, and square-footage completion timelines decided by the Project Management Office.
9) Material Custody & Handling: Carefully handle all premium corporate materials—including aluminum profiles, glass units, specialized hardware, and gaskets—during loading, unloading, structural shifting, and installation to prevent any scratches, dents, or damage.
10) Zero-Damage Logistics Metric: Maintain a strict zero-wastage and zero-damage record during all on-site material handling and fixing processes; any material damage caused by gross negligence or reckless handling will be evaluated for financial recovery.
11) Tool Kit Maintenance & Security: Properly maintain, clean, and securely store the complete set of power tools, drilling machines, hand tools, and specialized installation equipment issued individually to the technician by the company.
12) Tool Audit Compliance: Present the assigned individual tool kit for structural audits and inventory checks whenever requested by supervisors or the audit team; full tool handover is mandatory prior to processing final clearance.
13)Safety Protocol Adherence (100% PPE Rule): Wear all mandatory Personal Protective Equipment (PPE) gears at all times on-site without exception, adhering strictly to occupational health and safety guidelines.
14) Mandatory Safety Gear Compliance: Continuous usage of Safety Helmets, Steel-Toe Safety Shoes, High-Visibility Jackets, and Safety Harnesses while working at heights is mandatory; a single safety violation will result in immediate daily penalty or site suspension.
15) Professional Workplace Conduct: Maintain high moral ethics, discipline, and a professional code of conduct at all times with client representatives, main contractors, visitors, and fellow team members on-site.
16) Zero-Tolerance Discipline Clause: Maintain zero tolerance for fighting, physical altercations, usage of abusive language, intoxication, or any unethical practice on the work site, all of which will result in instant dismissal.
2) Adherence to Command Chains: Strictly follow and execute all technical, operational, and administrative instructions provided by the respective Site In-Charge, Project Manager, or PMO.
3) Prior Intimation of Leaves: Adhere to standard company leave guidelines; casual, unexcused, or unnotified absenteeism is strictly forbidden and constitutes a material breach of work discipline.
4) Leave Application Notice Period: Submit formal leave applications directly to the Site In-Charge and the HR department at least 48 hours in advance, except in cases of verified medical emergencies.
5) Zero Unauthorized Absence Rule: Any unexcused or undocumented absence exceeding 3 consecutive working days will automatically trigger immediate disciplinary proceedings or result in service discontinuation.
6) Digital Attendance Compliance: Utilize the Mr. KIT Mobile Application daily to mark geo-verified attendance check-ins and check-outs; manual, verbal, or late attendance claims will not be recognized or processed.
7) Real-Time Project Logging: Use the Mr. KIT Mobile Application to log real-time project milestones, task updates, and site completion metrics as required by the management.
8) Milestone Execution & Target Delivery: Work systematically to deliver daily, weekly, and monthly installation outputs exactly according to the technical layout plans, blueprints, and square-footage completion timelines decided by the Project Management Office.
9) Material Custody & Handling: Carefully handle all premium corporate materials—including aluminum profiles, glass units, specialized hardware, and gaskets—during loading, unloading, structural shifting, and installation to prevent any scratches, dents, or damage.
10) Zero-Damage Logistics Metric: Maintain a strict zero-wastage and zero-damage record during all on-site material handling and fixing processes; any material damage caused by gross negligence or reckless handling will be evaluated for financial recovery.
11) Tool Kit Maintenance & Security: Properly maintain, clean, and securely store the complete set of power tools, drilling machines, hand tools, and specialized installation equipment issued individually to the technician by the company.
12) Tool Audit Compliance: Present the assigned individual tool kit for structural audits and inventory checks whenever requested by supervisors or the audit team; full tool handover is mandatory prior to processing final clearance.
13)Safety Protocol Adherence (100% PPE Rule): Wear all mandatory Personal Protective Equipment (PPE) gears at all times on-site without exception, adhering strictly to occupational health and safety guidelines.
14) Mandatory Safety Gear Compliance: Continuous usage of Safety Helmets, Steel-Toe Safety Shoes, High-Visibility Jackets, and Safety Harnesses while working at heights is mandatory; a single safety violation will result in immediate daily penalty or site suspension.
15) Professional Workplace Conduct: Maintain high moral ethics, discipline, and a professional code of conduct at all times with client representatives, main contractors, visitors, and fellow team members on-site.
16) Zero-Tolerance Discipline Clause: Maintain zero tolerance for fighting, physical altercations, usage of abusive language, intoxication, or any unethical practice on the work site, all of which will result in instant dismissal.
Skills
- Fitter
Who can apply
- Eligible qualificationsAny
- Age limit25 – 35 years
- ExperienceUp to 3 years
- SubjectITI / Apprentiship / Diploma
- Open toMen
How to apply
-
1
Online application
Submit your application on this page before 03 Oct 2026.
-
2
Random Selection
The employer reviews applications and contacts shortlisted candidates.
-
3
Track your application
See every update under My Applications in your account.
Required Documents
Download official notification (PDF)FAQs
Who can apply?
Eligible qualifications: Any. Age limit: 25 – 35 years. Experience: Up to 3 years.
What is the last date to apply?
Last date: 03 Oct 2026
How do I apply?
Apply online on this page. Sign in, complete your profile, and submit before the last date.